Preliminary estimates put the cost at $575,000, including extending two stairwells, modification of corridors, installation of fire walls and installation of a new lift.
Additionally, the timber framed construction of houses, the general lack of fire walls and the corbelled upper floors allowed the fire to race through the ghetto.